100 easy to miss the budgetary cost summary

100 easy to miss the budgetary cost summary

10 Forget artificial multiplication factor Sinotrans soil

11 on the list, cables, wires, etc. only provide net engineering, plus when the group had reserved price, bending, wear and tear length

18, installed parts: base-rise buildings increased fee calculation includes six layers or 20m below all labor costs. At the same time, meet the ultra-high-rise building construction conditions, increased costs and ultra-high-rise buildings increased fees are calculated overlay 19, the roof line, the cover! Mainly sporadic parts!http://bestecig.en.alibaba.com/

20, sporadic, small concrete components easy-counting;

21, sub-lattice seam roofing, especially when there are overhead insulation, cement mortar layer partakers lattice seam, but the board has to be done in the heat of lattice seam;

22, a number of regulatory requirements is also easy to omissions, such as: Wall longer than 5 meters to the creation of structural columns, beams to additional pressure when more than 4 meters high wall; 23, equipment installation plus horn, pipe mount bracket fabrication, installation corrosion paint;

24, canvas ventilation ducts installed interfaces;

25, the top of the stairwell full house scaffolding, roofing sub-lattice seam design specification requirements and some of the interior and exterior structural member 26 sporadic, external plastering sub-grid caulking corresponding fixed subheadings, the use of different materials, should apply the appropriate subheading

27, the distribution of negative reinforcement ribs easily leak, because the drawings did not reflect. In addition to look outside to see the next site, no other way to 28, in excavation works, and now the pricing table, wet earth dug pumping fee not included (previously fixed is included), the project is now included in the measure that the twenty-first chapter of construction drainage, rainfall, deep foundation within the support section. In preparing, do not forget ah!

29 joints of various buildings: the sub-lattice seam roofing, wall and bulk water transfer asphalt caulking;

Protruding portion 30 is constructed column;

31, with pre-cast panels between;

32, playing precast piles, pile head, then pile, sending piles 33, Bored pile, steel casing, into the rock to increase fees, operating platform, is the use of underwater concrete pouring concrete 34 steel piles, dial separate cover mesh, the pit pit operations and the coefficient on the job 35, no detailed layout, but the project drawings mentioned in the description. Such as structural columns filled walls, reinforced masonry and other 36 measures of project costs of mass concrete temperature fee 37, civil engineering equipment reserved for the two embedded parts 38, civil engineering scenting wells, septic tanks items such as set of integrated fixed, Do not miss one of the appropriate measures projects, such as digging drainage fee wet soil, foundation drainage fee and scaffold template fees.